Barrie is one of the seven commuter lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto in a generally northward direction to Barrie, and includes ten stations along its route. From 1982 to 1990 and again from 1993 to 2007, it was known as the Bradford line, named after its former terminus at Bradford GO Station until the opening of Barrie South GO Station.
The Barrie line runs on the former Northern Railway of Canada route. This is the oldest operating railway line in Ontario, with passenger service beginning in 1853.
In 1888, the Grand Trunk Railway took over operation of the line. In 1923, the bankrupt Grand Trunk Railway was merged into the Canadian National Railway (CNR) network.
Planning for commuter services resulted in the establishment of the Newmarket Bus Terminal by 1970, from which commuters would be taken to the Richmond Hill GO Station to commute to Toronto.
John Crawford Medcof, operating a company named Railroad Boosters, rented a train for one-day service between Barrie and Toronto on 16 October 1969, earning a profit. He gave the proceeds to the government of Ontario to support a north GO train service promised by John Robarts in late 1969, but asked for the government to return the money when the provincial government announced it would not establish a Richmond Hill line service in 1970. He applied for a grant of from the federal government to operate a commuter train for twelve weeks, with one train leaving Barrie in the morning for Toronto, and a return trip at night. The grant was approved per the government's local initiatives program in December 1971. The train was operated by Canadian National Railways, and charged the same fares as those for the GO Transit bus service. Another trial commuter service from Barrie to Toronto was operated in late 1972, carrying 13,483 passengers.
In 1973, the Canadian Transport Commission held a public hearing at Georgian College during which its three-member committee heard presentations from Medcof and councillors from all "municipalities between Toronto and Barrie". All presentations favoured the creation of commuter train service between the two cities, including that of York—Simcoe MP Sinclair Stevens.
On April 1, 1972, CN introduced commuter service from Barrie to Toronto, as required by the Canadian Transport Commission. The service was transferred to Via Rail in 1978. As a result of federal government financial cutbacks to Via Rail, the service was transferred to the provincial government and integrated into the GO Transit network on September 7, 1982, but service only extended to Bradford. On September 17, 1990, the line was extended to Barrie, but was again cut back to Bradford on July 5, 1993.
In 2006, GO Transit built a bridge at the Snider diamond, which is the junction between the Barrie Line and Canadian National's primary east–west freight line, the York Subdivision. Since CN controlled both corridors, the passage of passenger trains over the diamond was often delayed by freight trains passing through the intersection. Constructing the bridge and associated trackage resulted in a grade separation of the two lines, eliminating such delays. Construction of the bridge began in February 2006, and the bridge was opened in December 2006. The entire project was completed in June 2007.
On December 17, 2007, the Bradford Line was extended to the new Barrie South GO Station and was renamed the "Barrie Line". Construction had begun on February 2, 2007, to construct the new Barrie South station, a new layover facility and new tracks, signals and crossings along the existing railway corridor. The project cost $25 million, funded by two thirds by the federal and provincial governments, and one third by the City of Barrie.
On December 15, 2009, Metrolinx purchased the portion of the Newmarket Subdivision within the City of Toronto from CN for $68 million. The Barrie line trackage, from Union Station to Barrie, is now fully owned by Metrolinx. As part of the agreement, the Canadian National Railway continues to serve five freight customers located on the Newmarket subdivision between Highway 401 and the CN York Subdivision.
On January 30, 2012, the Barrie line was extended north to the newly constructed Allandale Waterfront GO Station.
On December 31, 2016, year-round weekend train service was introduced with service every 75 minutes in both directions between Toronto and Aurora, including three daily trains per direction covering the full route between Toronto and Barrie.
On December 30, 2017, the GO Station (an intermodal station intersecting with the Toronto Transit Commission's (TTC) new Line 1 Yonge-University subway extension) opened, and service to York University station was correspondingly reduced to peak hours only. At the same time, the Barrie line's weekend train service was improved to every 60 minutes between Union and Aurora, and new hourly weekday off-peak service was introduced between Union and Aurora, as well as additional peak period trains between Union Station to Bradford GO Station. Although the station was intended to entirely replace York University GO Station, limited peak-period service was maintained to York University station following the opening of Downsview Park station.
Due to the temporary closure of the York University campus during the COVID-19 pandemic in Toronto, all service to York University GO Station was suspended on March 18, 2020. On July 19, 2021, Metrolinx announced that the station was permanently closed.
The grade separated crossing (which Metrolinx calls the Davenport Diamond Guideway) is on a long, high rail bridge. It lies between Bloor Street West and St. Clair Avenue West parallel to Lansdowne Avenue. The bridge will allow GO Transit to run all-day, two-way service on the Barrie line without freight traffic disruptions. The 2015 estimated cost of the project was $120 million.
The project began construction in 2017. The Davenport Diamond Guideway went into service on Monday April 3, 2023, and the grade-level Davenport Diamond went out of service on the prior weekend. The ground-level track approaching the diamond will be removed.
At the same time of building the guideway, further community improvements were added in the immediate vicinity, including noise wall and bearing pads, a rail overpass above Wallace Avenue and a pedestrian underpass at Paton Road, as well as a replacement of the Bloor Street West bridge.
Other grade separations are planned. One was completed at Rutherford Road immediately north of Rutherford GO Station, and another is planned at McNaughton Road north of Maple GO Station.
In addition to Union Station, four station buildings along the Barrie Line are federally protected by the Heritage Railway Stations Protection Act. At Allandale Waterfront and Newmarket stations, historic station buildings remain but are used for other purposes, while at Aurora and Maple stations, the historic stations buildings continue to be in use. The station building at King City was built in 2005; the 1850s building was relocated to Black Creek Pioneer Village in the 1960s, then to King Township Museum in 1989. Bradford station is not protected and has been heavily altered.
January 28, 2012 | 120 | Federally designated heritage railway station built in 1904–1905 for Grand Trunk Railway (GTR). | |
December 17, 2007 | 628 | ||
September 7, 1982 | 93 | GTR Bradford Station built in 1900 has been heavily altered from original design. | |
November 1, 2004 | 637 | ||
September 7, 1982 | 265 | Federally designated heritage railway station was GTR station c. 1900. Northern Railway of Canada station from 1850s became freight shed and demolished. | |
September 7, 1982 | 1,464 | Federally designated heritage railway station built by GTR in 1900. | |
September 7, 1982 | 555 | Original 1853 Northern Railway of Canada station moved to King Township Museum in 1989 and current station built in 2005. Connections with Ontario Northland bus services | |
September 7, 1982 | 1,319 | Federally designated heritage railway station built by GTR in 1903. | |
January 7, 2001 | 970 | ||
December 30, 2017 | 0 | Connection to Yonge–University | |
Connection to future Eglinton | |||
Bloor–Lansdowne | Proposed station | ||
Union | September 7, 1982 | 0 | Connection to Via Rail, Amtrak, Union Pearson Express, GO Transit rail & bus services, Ontario Northland and TTC Yonge–University, streetcar & bus services.
Federally designated heritage railway station, built by Toronto Terminals Railway opened in 1927 |
Weekend service consists of hourly trains in both directions. Five trips in each direction cover the full route from Toronto to Barrie, while the remainder operate between Toronto and Aurora. Trips terminating in Aurora have connecting GO bus service to Barrie.
During the times and directions that train service does not operate, service is provided by GO bus routes 63 (Toronto–King City), 65 (Toronto–Newmarket) and 68 (Newmarket–Barrie).
The maximum speed on the line is , between Bradford and Barrie South. Trains are limited to in some parts, but can travel at least over most of the line.
Due to the COVID-19 pandemic, starting on May 13, 2020, most off-peak train service was suspended and replaced with buses due to low ridership. Off-peak train service was gradually reintroduced throughout 2021.
Of these, most were rejected as unsuitable, either because they were too close to other stations, or for failing to meet other criteria, such as connections to other services, proximity to urban growth centres, construction viability, urban density, or necessary infrastructure. Others were rejected because they were considered for other lines on the network. Four sites were considered for either the Barrie line or the Kitchener line. The sites at Highway 7 in Vaughan and at St Clair Avenue West were not included as part of the 10-year RER expansion, but are part of a future expansion program. The candidate location Bathurst Street at Side Road 15 was deferred for future consideration.
Stations have been approved in Vaughan for the Kirby Road site (serving the community of Hope), at Mulock Drive in Newmarket, and in Innisfil. Under the Regional Express Rail initiative, new stations are planned in Toronto: Bloor–Lansdowne GO Station at Bloor Street West (near Lansdowne Avenue and subway station) and Spadina–Front GO Station at Spadina Avenue near Front Street (with access to the CityPlace neighbourhood and 510 Spadina streetcars).
The weekend summer service had 105 riders per train in 2012 (32,000 total for six trains per day), and 220 riders per train in 2013 (41,000 total for four trains per day).
From 2010 to 2014, ridership on the line increased 70% based on cordon count data. For 2015, there was a weekday morning peak of 5,852 boardings and 227 alightings at the stations on the line, all other passengers alighting at Union Station in Toronto.
Connections
Future
Capacity expansion
Additional stations
Caledonia station
Innisfil GO Station
Concord GO Station
Ridership
+2015 weekday morning peak ridership
!Station
!Boardings
!Alightings Allandale Waterfront 254 0 Barrie South 263 0 Bradford 229 2 East Gwillimbury 337 5 Newmarket 358 15 Aurora 1,113 15 King City 444 1 Maple 1,701 2 Rutherford 1,121 22 York University 32 165
Notes
External links
|
|